Prior to serial production each ServoPress modul is being
tested under rough full load conditions. The results and
improvements from these tests are to your benefit.
• Endurance test over 3 months
• 20 million load cycles over the entire working stroke
with nominal force and lateral force components at full
travel speed.
• Cycle time approx. 2 seconds.